Our Services
Timber Frame Erection
About This Service
Timber Frame Erection
Atom Carpentry LTD provides specialist timber frame erection backed by over 20 years' hands-on experience. A team of more than 25 skilled, certificated erectors (including slinger/signallers, crane and lift supervisors) ensures safe, accurate assembly on every site. We work with developers, contractors and private clients across the South East to meet structural tolerances and programme milestones. Family-run reliability means a single point of contact and clear communication from mobilisation to handover.

Our Process
How It Works
Site survey & logistics
We carry out a measured setting-out visit, check foundations, anchor bolt positions and crane access, then produce a staged erection plan and RAMS aligned with the main contractor programme.
Delivery & crane setup
Frames arrive on pre-booked deliveries; our certificated slinger/signaller and crane supervisor coordinate lifts and temporary bracing with the contractor to ensure safe, efficient offload and positioning.
Erection, checks & handover
Erectors assemble panels, secure structural connections and install temporary bracing and ties; we complete tolerances checks, attach manufacturer's fixings and issue a handover pack with site QA records.
Benefits
Why Choose us for Timber Frame Erection?
Proven timber-frame expertise
Over 20 years specialising in timber frames means accurate setting-out, tight tolerances and fewer on-site surprises for houses, apartment blocks and developer plots.
Skilled, certificated teams
A workforce of 25+ certificated erectors, plus slinger/signallers and crane/lift supervisors, delivers consistent safety and workmanship across every project.
Dependable, contractor-friendly service
Family-run reliability with clear communication, coordinated logistics and a focus on meeting programme milestones and site safety requirements.
Precision erection for every project scale. Whether it’s a spec timber-frame house, a residential extension or a multi-unit contractor development, Atom Carpentry LTD erects timber frames to manufacturer and structural engineer specifications. Our erectors work from detailed setting-out drawings, verify foundation bolts and plate levels, and ensure all panel interfaces and packings meet structural tolerances before permanent fixings are applied.
Safety, crane control and programme discipline. We supply certificated slinger/signallers and work alongside appointed crane contractors under the supervision of our crane and lift supervisors. Temporary bracing, weather protection and scaffold coordination are standard practice to protect timber and trades following erection. As a family-run business we provide a single point of contact and thorough handover documentation including QA checks and site photos.
FAQ
Frequently Asked Questions
We coordinate crane lifts and supply certificated slinger/signallers, crane and lift supervisors to manage on-site operations. We can work with cranes supplied by the main contractor or arrange crane hire in liaison with site logistics, ensuring safe lift plans and exclusion zones are in place.
Arrange a site assessment for timber frame erection
Other Services
